BAIRD HAS ‘LET THEM EAT CAKE’ MOMENT OVER WESTCONNEX DESTRUCTION
PREMIER Mike Baird was confronted in Haberfield on Tuesday by dozens of local residents whose communities are set to be destroyed for WestCONnex as he attended the opening of a local patisserie.
Read more"What we are facing is the destruction of Haberfield"
WE received the following email from longtime Haberfield resident Graeme McKay, who sent it to every MP in NSW. It's a powerful and heartfelt account of what WestCONnex's destruction means - not just to residents of Haberfield, but for people across the toll road's destructive 33km route.
Read moreRESIDENTS STOP WESTCONNEX DRILLS AS PROTESTS CONTINUE
DRILLING works for the WestCONnex New M5 toll road were stopped yesterday after residents occupied the planned construction site in Terry Street Tempe.
Read moreSubmission on New M5 and endangered species
Submission regarding referral Reference Number: 2015/7520
Posted by · March 06, 2016 10:58 PM
2UE with Mike Jeffries on WestCONnex
Pauline Lockie of WestCONnex Action Group speaks to 2UE's Mike Jeffries about WestCONnex: why the Baird Government isn't being honest or transparent about WestCONnex, compulsory acquisitions, short-sighted road building and what's next for the campaign.
Read moreRESIDENTS DEMAND WESTCONNEX HALT AS MORE DESTRUCTION LOOMS
WESTCONNEX Action Group has demanded an immediate halt to the $16.8 billion WestCONnex toll road after Fairfax Media revealed more homes and businesses are likely to be acquired and destroyed to make way for the planned Rozelle and Camperdown interchanges.
Read morePauline Lockie speaks to Bill Woods on 2UE about WestCONnex
Pauline Lockie of WestCONnex Action Group speaks to 2UE's Bill Woods about WestCONnex: its tolls, cost blowouts and looming failure to ease congestion, and the likely impact of unfiltered stacks and forced acquisitions in Rozelle, Lilyfield and Camperdown.
Read moreNEW WESTCONNEX REVIEW EXPOSES TOLL ROAD’S SHAM BUSINESS CASE
WESTCONNEX Action Group welcomed the release of a new independent review of the WestConnex business case, which confirmed the $16.8 billion toll road would be unlikely to recover its cost or ease traffic congestion.
Read more1.0 Objection to the failure of WestConnex, including the New M5, to achieve its stated core objectives
WAG objects to both the failure of WestConnex to meet its stated core objectives and the manner in which these objectives were formulated.
Read more2.0 Objection to the lack of transparency and proper process
WAG objects to the lack of transparency and proper process that has characterised the WestConnex project since its inception, and continues to do so with the New M5.
Read more